Skip to Content

Current projects

ProjectDescriptionTS Contact
Gold Coast Building CProvide IT services to service the Gold Coast Building C's desktop/Printing, AV, CCTV and Networking requirementsGina White
Network Upgrade ProjectNetwork Upgrade to Huawei networking equipment (including Wireless and Uninterrupted Power Supplies)Gina White
CCTV ReplacementReplacement of CCTV system and upgrade of Digital to IP across Lismore and GCGina White
Services Backup and RecoverySBRP will deliver a modernised data and services protection capability that is able to respond to the current and emerging data and services demands and complex disaster recovery/ business continuity challenges to provide increased reliability, scalability and performance, reducing organisation risk, improving operation efficiency and reducing costsShane Morris
CHEC Data Centre Risk MitigationRisk mitigation for business continuity for all partners. Fire suppression, cooling and power upgradesLuke Walford
PABX ReplacementReplacement of ageing Phone systems (Plessy at CHEC and Alcatel at Lismore) including Alcatel upgradeGina White
Web Content Mgt (CMS) (Web Upgrade)Replace existing CMS websys system with Terminal 4 CMS cloud-based systemGeoff Muldoon
CRM EnhancementsSystem usage optimisation changes for Alumni and Dev, SASS, FST
Microsoft CRM 2016 Upgrade
Microsoft Best Practice Review outcomes actions
Erin Stubbs
De Duplication ProjectRemove duplication of students in the CRM and SMS using the Experian Unify SoftwareKim Bennett
Syllabus PlusReplace the existing legacy system, Class Planner, with Syllabus Plus - integrated with Student Management SystemElaine Booth-Barker
UCMS EnhancementsSystem usage optimisation changesMo Dickson
Windows 10/Office 2016 Upgrade for Students and Staff + Desktop SecurityUpgrade of Staff and Student Standard Operating Environments (SOE's) to Windows 10/Office 2016 + SecurityPaul Austin
Farmers Co-op Innovation CentreTechnology Components of the Farmers Co-op Innovation CentreMichael Assim
IRMA HDR Phase 2Rollout the IRMA HDR Phase 2 to staff and students for management of HDR studentsAnn Emms